EPC Project Management – End-to-End Takeover (Day Rate)
Full project takeover from blank page to start-up, with structured governance, controlled execution and reimbursable flexibility.
Who is End-to-End EPC Project Management for ?
This service is designed for industrial organizations requiring immediate project structuring, leadership and execution control across engineering, procurement and construction phases.
– Industrial groups launching a new project from scratch
– Organizations facing a lack of internal EPC leadership capacity
– Projects requiring structured PMO and governance implementation
– Companies entering complex export or regulated markets
– Projects experiencing coordination gaps between engineering, suppliers and site execution
– Organizations seeking execution acceleration without committing to a rigid lump-sum structure
This intervention is particularly relevant when speed, governance discipline and execution control must be combined within a flexible contractual framework.
Typical project situation
The project may start from a blank page or require restructuring after early misalignment. Scope definition, WBS breakdown, CAPEX consolidation and governance structures are not yet stabilized. Execution pressure increases while coordination between stakeholders remains fragmented.
The need is not only management presence, but structured project leadership capable of aligning engineering, procurement and site execution under corporate governance standards.
What End-to-End EPC Management Allows You to Achieve
This service ensures continuity from early structuring to execution and start-up, while maintaining budget control, interface clarity and decision governance.
A Mission Covering the Full EPC Lifecycle
Phase 1 – Project Structuring and Governance Setup
Definition of scope, WBS and BOQ. Planning framework establishment and CAPEX structuring. Implementation of PMO tools including KPIs, dashboards, risk registers and governance committees.
Phase 2 – Procurement and Supplier Control
Preparation of technical specifications, supplier selection, contractual alignment and expediting. Supervision of FAT and coordination of export control and logistics when applicable.
Phase 3 – Execution and Start-Up
On-site coordination, installation supervision, pre-commissioning and commissioning management. Structured reporting to management and controlled transition toward commercial operation.
Intervention mode
Why End-to-End Management Secures Execution
The FID Sprint is not intended to produce an additional document, but to tangibly improve the quality of the decision. It enables a shift from a project perceived as uncertain to a structured assessment of risks, assumptions, and priority actions.
LIST OF BENEFITS
– Acceleration of project structuring and decision-making
– Reduced coordination gaps between engineering, suppliers and site teams
– Improved cost and schedule control through structured governance
– Clear accountability via defined RACI and milestone discipline
– Increased confidence of senior management and stakeholders
– Option to convert to lump-sum structure once scope stabilizes
Pricing
650 € to 850 € per day (France / EU)
Export outside EU: defined upon review of project constraints.
Travel and site expenses: reimbursed according to client policy.
Possible conversion to fixed-price structure once scope and perimeter are stabilized.
This service provides execution discipline without imposing rigid contractual constraints too early in the project lifecycle.
Need Structured EPC Leadership?
From blank page to start-up, disciplined project management secures execution.